Tuesday, 22 December 2020


Time and resource are the two main elements in a specific project, let it be a business or even as simple as group work among your colleagues. These elements often become a constraint or a limitation to the project. Members of the project will eventually pick up the way to tackle these constraints as time goes. In a project, time and resource constraints definitely need to be overcome in order to implement effective solutions and a successful project.

Time constraint can be defined as the limitations on the start and end times of a project. Most of us tend to get confused with the definition of two terms which are time constraint and the time restraint. Well, a time constraint is defined as a limitation imposed on you by someone else. Time restraint is inability to reach a goal because of your own shortage of time.

A proper scheduling is vital when it comes to time constraint. Time can be managed well when an individual has a proper planning, scheduling, monitoring, and control.

Resource constraint is defined as the limitations of inputs available to complete a particular job primarily people time, equipment and supplies.

Some things that an individual can do when facing resource constraints are to create a realistic timeline, segregate tasks, have a collaborative scheduling, proper planning and predict risks.


As time goes, every individual will figure out how to comply with time and resource constraints as the projects will rely on numerous tasks and inputs. One should plan ahead so that you are in good shape to move forward, when the time comes. A successful project with limitations are possible when every individual in team is willing to overcome every restraints.



Time constraints and resource constraints

 Time constraints and Resource constraints


What is constraints? Constraints are a limitation of a particular resource and it can by anything. it's also something that restricts someone or something.Constraints are often categorized into two differing types of limits placed our lives deadlines and resource limitations. 

Source: Google Images

Time constraints ask a project. While a time constraint is defined as a limitation imposed on you by somebody else , a time restraint is defined as an inability to succeed in a goal due to your own shortage of your time . deadline, and sub-deadlines along the trail to reaching goals.  

Source: Google Images


Resource constraints ask more controllable elements, like materials and access to needed equipment. Frequently these constraints are at odds with one another . for instance , limited resources might make it impossible to satisfy a project's deadline, or an unreasonable deadline might tax your resources beyond the purpose of profitability. this will cause difficulty in our daily tasks. Every project you accept would require some combination of your time and resources.

Source : Google Images

There are several ways we can overcome constraints in our life which are by:

1.Embrace Your Constraint
2.Explore New Solutions
3.Access New Resources
4.Motivate Your Team

There is also a matter of time-limited scheduling, as some people are likely more effective at some jobs than others. How you allocate the schedule with regards to order, quantity, and timing can be a good way to maximize your business productivity within time and resource constraints.




Source : Google Images






 The word "constraints" in business management refers to those things that limit a manager's options. Smooth project management requires a solid understanding of both time and resource constraints. Managers should be able to assess the company's available resources before determining reasonable time lines for different projects. Successful project planning and management requires that managers are able to accurately assess both types of constraints and form compromises wherever possible.


source:Google

Constraints can be categorized into two different types of limits placed on your business which is time constrain and resource constrain.


"Time constraints" refer to a project's overall deadline, and sub-deadlines along the path to reaching goals.Most people are involved with commercial projects in highly competitive industries. Usually, these projects are done to generate profit. The objective of such projects is to produce a for-profit service or product that can be commercially marketed. Any delay in producing the end result of such a project can reduce the time to market and lead to reduction of profits.



                                                                     source:Google  


Resource constraints" refer to more controllable elements, such as staffing, materials and access to needed equipment. Frequently these constraints are at odds with each other. For example, limited resources might make it impossible to meet a project's deadline, or an unreasonable deadline might tax your resources beyond the point of profitability.Successfully completing projects hampered by significant resource constraints requires creative problem-solving skills.

source:Google

The key to managing the constraints and ultimately having a successful project is transparency. If there is a decision that needs to be made, understanding the specific project constraints and how they affect the project is what will drive you to make the decision that are right for the product.

source:Google









Time constraint and resource constraint

 

What Are Constraints in Project Management?

source : google


With any project, there are limitations and risks that need to be taken into account and addressed to ensure the project’s ultimate success. The three primary constraints that project managers should be familiar with are time, scope and cost. These are frequently known as the triple constraints or the project management triangle. Each constraint is connected to the other two; so, for example, increasing the scope of the project will likely require more time and money, while speeding up the timeline for the project may cut costs, but also diminish the scope.

source: google


Time constraint

When it comes to the time constraint, proper scheduling is essential. According to the Project Management Body of Knowledge (PMBOK), the following steps should be taken for effective time management:

1) Planning: This includes defining the main goal(s) of the project team, how the team intends to achieve the goal, and the equipment and/or steps that will be taken to do so.

2) Scheduling: The project management team must plot out the realistic timeframe for completion of each phase of the project.

3)Monitoring: This step occurs once the project is underway and requires the project team to analyze how the past stages of the project performed, noting trends and impacts on future plans, and communicating these findings to all relevant stakeholders.

4) Control: In the control step, the team must, upon communicating the results of each phase of the project, move forward accordingly. That means if things are running smoothly, the team must analyze the factors contributing to that positive outcome so that it can be continued and replicated. If there has been a derailment, the team must know how and why the derailment occurred and take steps to correct it for future actions.

source : google





Resource constraint is a constraint related to the low availability of inputs to complete a particular goal. The inputs can be of number of available workers, supplies and also availability of machinery. Availability of inputs can benefit a company by providing a reduced workload to workers, increased productivity and increased efficiency of outputs. 

source : google





 Time constraint and resource constraint

The word "constraints" in business management refers to those things that limit a manager's options. Smooth project management requires a solid understanding of both time and resource constraints. Managers should be able to assess the company's available resources before determining reasonable time lines for different projects. Successful project planning and management requires that managers are able to accurately assess both types of constraints and form compromises wherever possible.

source: google

Constraints can be categorized into two different types of limits placed on your business: deadlines and resource limitations. "Time constraints" refer to a project's overall deadline, and sub-deadlines along the path to reaching goals. "Resource constraints" refer to more controllable elements, such as staffing, materials and access to needed equipment. Frequently these constraints are at odds with each other. For example, limited resources might make it impossible to meet a project's deadline, or an unreasonable deadline might tax your resources beyond the point of profitability.

source :google

When it comes to the time constraint, proper scheduling is essential. the following steps should be taken for effective time management:

Planning: This includes defining the main goal(s) of the project team, how the team intends to achieve the goal, and the equipment and/or steps that will be taken to do so.

Scheduling: The project management team must plot out the realistic timeframe for completion of each phase of the project.

Monitoring: This step occurs once the project is underway and requires the project team to analyze how the past stages of the project performed, noting trends and impacts on future plans, and communicating these findings to all relevant stakeholders.

Control: In the control step, the team must, upon communicating the results of each phase of the project, move forward accordingly. That means if things are running smoothly, the team must analyze the factors contributing to that positive outcome so that it can be continued and replicated. If there has been a derailment, the team must know how and why the derailment occurred and take steps to correct it for future actions.

source : google

Chemical process design choices are coupled with changing resource constraints. for example, feed materials and water resource. The need to incorporate sustainable resources as part of a methodology for sustainable chemical process design and operation is also included in this work. 

source : google





TIME CONSTRAINT AND RESOURCE CONSTRAINT

 The definition of time constraint refers to the limitations on the start and end times of a project. While, The resource constraint definition refers to the limitations of inputs available to complete a particular job primarily people time, equipment and supplies. Every project you accept will require some combination of time and resources

Time constraint and resource constraint is basically use when you are starting your own business, you will quickly learn how to allocate your time and resources

(Google image)

 As your business grows, then eventually, you may need to overcome your time constraints and your resource constraints, and to implement effective solutions.
As your business experience success, you may reach the point at which you have more project demands than you can handle in a single week. Let's say that you have five clients per week, each of whom you provide with eight hours worth of projects per week. If two of them ask to give you 50 percent more projects per week, how will you respond?

(Google image)


Before becoming overwhelmed or overly delighted with your good fortune take a moment to consider your options so that you can move forward in a deliberate way, without causing frustration to yourself or your clients. You can choose to:

  • 1. Refuse the new projects.
  • 2. Work an extra eight hours per week.
  • 3. Become more efficient in your work practice.
  • 4. Work with clients to prioritize projects or lengthen deadlines.
  • 5. Hire additional help.


The Resource Constrained Project Scheduling Problem (RCPSP) is the sub-class of the Scheduling Problem that deals with scenarios where personnel or workforce employed to perform the tasks are limited and each job has an arrival time, a due date, and a penalty associated to delays. In this article, we consider a special case of the RCPSP, which we will denote as the Resource Constrained Project Scheduling Problem with Bounded Multitasking (RCPSPBM), where human analysts are able to perform a limited number of tasks in parallel in exchange for cognitive overhead costs. We present a description of the problem and introduce an exact Mixed-Integer Linear Program formulation of the (RCPSPBM), used to evaluate the efficiency of (typically online) algorithms employed by dispatcher

(google image)

The above image is resource constraint scheduling

Successfully completing projects hampered by significant resource constraints requires creative problem-solving skills, according to the University of Washington. Often a creative manager can shift resources such that budget constraints can be adhered to without pushing back deadlines too much. In some cases, constraints such as budget restrictions mean a project cannot be completed or must be postponed

(google image)

That's all from me thank you





ROADBLOCKS IN THE WORKPLACE: MEANING OF TIME CONSTRAINT AND RESOURCE CONSTRAINT

Somewhere or sometime in an organization or company, there is bound to be occasions that would halt in reaching company goals in the short term or the long term. These are called constraints and is caused by multiple factors. There are 2 types of constraints which are time constraint and resource constraint. I will tell you the difference in both of them and my experience handling both situations.


Source: Google Images


Source: Google Images


Time constraint is a restriction that occurs when a certain goal must be accomplished within a limited time frame. Time constraints can be from an example, an urgent job that is required by a company to be fulfilled within a day. Time constraints can lead to low output quality, increased worker stress and high short term spending to overcome the situation. 

My experience in handling time constraint was back when I worked as an Operations Manager in the Food and Beverage Industry. There has been a delay in food stocks arriving by the suppliers. As an Operations Manager back then, I had to overcome the problem by sourcing, on my own, the related food stocks needed to optimize operations of the outlet. If I do not act quickly to overcome the situation, there might be a shortage in food able to be served in the outlet and it will tarnish the company's reputation. I had to call up my superiors to justify the situation and make purchases that leads to the monthly budget exceeding allocated numbers. Nevertheless, I assured my superiors that by doing this ensures the company's reputation is always providing best service, consumer's brand satisfaction and delivering what is needed for sustainability of operations.

Source: Google Images


Source: Google Images

Resource constraint is a constraint related to the low availability of inputs to complete a particular goal. The inputs can be of number of available workers, supplies and also availability of machinery. Availability of inputs can benefit a company by providing a reduced workload to workers, increased productivity and increased efficiency of outputs. 

My experience with resource constraints are plentiful. For example, when there are more than 1 staff on leave due to emergency. This causes disruptions in operations within the Kitchen Department, Managerial Department and Service Department as there needs to be multitasking involved to overcome the absence of worker that results in increased workloads. Thus as a competent Operations Manager that knows the SOPs of the store, I need to multitask that day by supervising the Kitchen crew, involve myself in service to customers and also do daily managerial tasks needed for the day. If I did not multitask, the whole outlet's operation would go haywire and the workers would be in disarray.

Monday, 21 December 2020

Time constraint and resource constraint

 

Every project that we accept would require some combination of our time and resources. So it will have time constraint and resource constraint. Constraint defined as something that limits or restricts someone or something. The time constraint is the constraint by time limitation. The resource constraint definition refers to the constraints of inputs available to finish a specific job such as primarily people time, equipment and supplies.

 

source:google image

The example of time constraint is short voyage. When we are in short voyage which mean that the distance or the locations between two port is short, we will not have much or enough time to prepare for the loading of cargo. For example, we do not have enough time to do the tank cleaning and we will do the tank cleaning operation in ‘shortcut’ way in order to make the tank ready to load the cargo.

 

source: google image



It has two factors regarding the time constraint which is the factor that we can control and the factor that we cannot control. The example of the factor that we can control is prioritization. We need to start doing the most important job first and last will be the unimportant job. If we do the unimportant job first, then at the last the important job will have limit or less of time to do it. The example of the factor that we cannot control is environmental conditions. If we are in bad weather such as heavy rain or strong wave, we cannot do the maintenance of the ship because of this situation so the ship will not in good shape.

 

source: google image




The example of resource constraint is delayed spare part. For example, Chief officer ordered the spare parts and the spare parts will be deliver when the vessel arrive at Singapore anchorage. But the spare parts did not come when the vessel arrived at Singapore. Then the chief of officer will order again the spare parts and will receive it at the next port. When the vessel come back to the Singapore anchorage, the spare parts that did not receive , come to the vessel. In this case the number of spare parts will be double and the remaining spare parts will not be used and also decrease the space in the store.

 

source: google image


It has two factors that could cause resource constraint which is external factor and internal factor. The example of internal factor that could cause resource constraint is company budget. When the vessel go to port where the provision is very expensive than the other country’s port, they have no choice but to buy some of the provision because the vessel will sails about few weeks to the next port. So they need the provision for the meals of the ship’s crews and it will increase the budget that company need to spend. The example of external factor that could cause resource constraint is the delays in the delivery of supplies which already explain about it.







Wednesday, 16 December 2020

Time Constraint And Resource Constraint

If you are starting your own business, you will quickly learn how to allocate your time and resources, which are also known as your constraints or limitations in completing a specific project. As your business grows, then eventually, you may need to overcome your time constraints and your resource constraints, and to implement effective solutions. 

Source : Google

The definition of time constraint refers to the limitations on the start and end times of a project. It's important to note that the difference between the time constraint definition and the time restraint definition. While a time constraint is defined as a limitation imposed on you by someone else, a time restraint is defined as an inability to reach a goal because of your own shortage of time.

Source : Google

The resource constraint definition refers to the limitations of inputs available to complete a particular job like primarily people time, equipment and supplies. Every project you accept will require some combination of time and resources.

Source : Google

If you are a sole practitioner, you may have 40 hours of time per week to distribute among your available projects. And if your only equipment and supplies reside within your computer, that may be your only resource. In this situation, if you accept no more work than you can handle per week, your time constraints and resource constraints will always remain in balance.

Source : Google

The word "constraints" in business management refers to those things that limit a manager's options. Smooth project management requires a solid understanding of both time and resource constraints. Managers should be able to assess the company's available resources before determining reasonable time lines for different projects. Successful project planning and management requires that managers are able to accurately assess both types of constraints and form compromises wherever possible.

Tuesday, 24 November 2020

 LEADESHIP IN " PATTON "

source: google images

Patton is a movie released in 1970 which tells the tale of General George S. Patton, a famous tank commander in World War II. This movie begins with Patton's career in North Africa and progresses through the invasion of Europe and the fall of the Third Reich.

source: google images

General Patton is widely considered as one of the most famous and effective military leaders of the past century. He was able to produce more results, in less time, with fewer casualties than any other general, in any army during World War II.

source: google images

His tactics were bold and his ability to instill trust in his troops were impressive. This played a huge role in turning the tides of the decisive Battle of The Bulge. During this key time of the war, his proposed strategy was so audacious many of his superiors thought it was impossible. However, it is now considered one of the best military movies of all time.

source: google images







MANAGEMENT PLANNING PROCESS

source: google images

Today I would like to talk about the first and most important step in a management process which is planning. Planning is the process of thinking about the activities required to achieve a desired goal. It is the first and foremost activity to achieve desired results. It involves the creation and maintenance of a plan, such as psychological aspects that require conceptual skills.

source: google images

The process of planning is done to obtain a specific goal and the most efficient route to reach that goal. The most important questions that come to mind during a planning process are why, where, when, who, what and how. Finding definite answers for these questions will ensure smooth sailing in achieving a goal.

source: google images

Planning is important as by nature it enquirers about organizational goals and involves decision making about desired ways and means to achieve goals. Planning is the process by which managers establish goals and define the methods by which these goals are to be attained.

source: google images















 

Wednesday, 11 November 2020

LEADERSHIP IN TOY STORY MOVIE

 So, the character that i felt the have the characteristic of leadership is Woody. He’s independent and strong willed with good management skills who can express himself to others. Woody cares about the other toys and takes them into consideration when he makes a decision. These qualities as a leader were scuppered at first as he, as all the toys, needed to ‘belong and be loved’ by Andy.


(google image)

In toy story 4, Andy sent the toys including Woodie, buzz, and all the other toys to a kid named Bonnie. She was 6 years old at that time. Bonnie was sent to kindergarten by her parents. The first class has started and the teacher asked the kids to make their own toy. Bonnie made a toy using fork and named her toy forky. 

(google image)

Woodie followed bonnie to kindergarten in her bag as he was worried to bonnie and because of the other toys asked woodie to follow her. This is the leadership in woodie which he was very brave and accept what the others ask to do as he is their leader. Since that time, forky has been bonnie favorite toy


(google image)

So, one day Bonnie and her parents went to holidays. After about hundred miles away, suddenly forky fell from her car at early in the morning. Woody saw and jumped from the car to save forky. He walked with forky to find Bonnie and her parents. This is the leadership in woody which he never let someone left behind. 

(google image)

He tells forky that he is not a trash, he is the best toy that Boonie ever had. Until forky realised and happy and starting to find bonnie back. A good leader will always motivating others to be always motivated. After miles away walking, they finally meet bonnie back.

In conclusion, for me woody is the best leader in movie i ever seen. He would never let others down. He will always find the solution if there is any problem. If they are in circumstances, woody would the first to step up and keep moving forward. That;s all from me Thank you





Tuesday, 10 November 2020

Leadership's Movie: THE EXPENDABLES

 




Source: Google Image
The Expendables is an English movie that was released in the United States on 13th August 2010. This movie already has 3 series which 2nd movie released on 17th August 2012 and 3rd movie released on 15th August 2014. One of the reasons why I like this movie is because of the actors stared in this movie. Most of the main actors is the top popular actor in the world such as, Slvester Stallone, Jason Statham, Jet Li, Dolph Lundren, Arnold Schwarzenegger, Bruce Willis, Harrison Ford and many other actors. This movie is about a group of elite mercenaries which going some task given by other people who paid them. This movie named ‘The Expendables’ because the group in this movie called The Expendables.

 

The Expendable is a group lead by Barney Ross (Slvester Stallone) and has 4 main members which is Lee Christmas(Jason Statham), Gunner Jensen(Dolph Laudgren), Hale Caesar(Terry Crews), and Toll road(Randy Couture). All members in the group has a skull tattoo on their arm to indicate that they are cre of the Expendables. In the first movie, The Expendables deployed to the coast of Somalia to halt local pirates from executing the hostages. After a successful mission to save the hostages, the Expendables are invited by a secretive CIA agent, Mr. Church(Bruce Willis) to kill corrupt general Garza. Mr. Church offers the team 5 million dollars to complete the task.

Source: Google Image

 

In 2nd movie, Barney Ross again approached by Mr Church, who wants him and his members to go to Albania to retrieve something that was on a crashed plane. Church also send a people under him, Maggie to go with them. The things inside the plane was successfully recovered but while returning to their plane, they find that one of the Expendables member, Billy The Kid(Liam Hemsworth) has been captured by a group of men under the command of Vilain(Jean-Claude Van Damme). Billy The kid is a new member of The Expendables. He is an ex-military sniper which disenchanted after service in Afghanistan. Although Barney Ross, already gave the thing but they still kill Billy and run away. Barney and his men decide to track down Vilain and his group to kill them.

 

In 3rd movie, after the team successfully rescue Doc, they go to Somalia in assignment of stopping the dealer Victor Mins during a transaction of bombs. However, they discovers that the dealer is actually the former Expendables, Conrad Stonebanks, who shoot Hale Caesar badly. In order to avenge Caesar, Barney recruit a new, faster and tech-savvy team. Barney refuse the co-0peration of his old member because they are old and slow now. They head to Bucharest but their mission fails and only Barney escapes from Stonebanks. Now Barney intends to return to rescue his team with the outcast Galgo. However, his old team is like a family and they will never leave Barney fighting alone because family fights together to protect a member.

 

Source: Google Image

 

This movie has lot of leadership elements that we can take for our lesson. Of course, this element we can see it all in in the main character, Barney. As a leader of The Expendables, he always care his team members. He looks after his men as his own family. In 3rd movie, when Barney and Galgo preparing to rescue their new members, Galgo always talks about the story regarding the unknown soldiers to Barney. Although, Barney looks like he never pays attention in the story, later on Galgo surprise that barney actually listen to all his story and also remember the soldier’s names. Barney also know that the story is about Galgo’s teammates who died in battlefield even though Galgo never mention it. From that moment, galgo determined to join The Expendables because he knew that Barney is a good leader and this team is what he looking for. Barney also have a good planning skill. Barney always plan the strategy carefully and brief his men about the strategy before they carried out their assignment. He always ask his men’s opinion and if they has suggestion, he will respect and hear their suggestion. He also is a responsible leader. He took responsibility when one of his men, Billy The Kid died and tell others that it is his fault that Billy died and promise to get revenge. Then, he also have good communication skill. In 3rd movie, Barney recruit new and young team. Although, the new members is young, he can communicate well and cooperate wisely with them. Without this element, a leader cannot control his team well and this movie prove that communication skill is very important in leadership.  

 

Barney Rose
Source: Google Image

 

In my opinion, peoples must watch this movie because it has many lessons that we can take and that’s why I choose this movie for leadership movie. I really hope that they will release the 4th movie of the Expendables. That’s all for today..

Source: Google Image